Canada is not an infrastructure “joke.” It is a country with some world-class delivery organizations operating inside a political system that too often destroys continuity. Relative to the G7, that makes it mediocre and volatile, not uniquely incompetent. And, in nuclear specifically, probably no worse positioned than its peers, though the ten-reactor rhetoric is substantially more ambitious than the underlying commitments at this time... (not surprising - it's a politician making an announcement, which is something of a prerequisite for making a "real plan" anyways).
As a Canadian, I think Canada’s primary hurdle is not a lack of engineering competence, but rather political volatility. Projects like Calgary’s Green Line often suffer from shifting scopes, fragmented authority, and delayed funding. Conversely, the recent Darlington nuclear plant refurbishment finished early and under budget. This proves that Canada can successfully execute megaprojects when planning is front-loaded and standardized.
Another comment I'd make is that the Carney government is only just a bit more than one year old. They're writing a whole lot of new policy. Will they succeed more than past governments? Who knows. But, at least they're spending the majority of their political capital trying to build stuff.
Federal funding for the green line was announced in 2015, and IIRC they originally predicted a 2026 opening date for branches covering the north and south of the city - street running in the north central part and a bit in Seton, a short tunnel downtown, and dedicated ROW elsewhere. This was back when planners were still really into streetcars/trams. The funding mix was supposed to be $1.5 billion each from the city, province and feds.
The city sat on their hands for years, perfecting and re-routing the downtown part[1]. Eventually, the plan was shortened to 16 Ave N to Shepard with a long tunnel downtown. The city ordered $100s of millions of low-floor trains, incompatible with the existing ones, necessitating building a new maintenance facility. The cost at this point was $5.something billion.
Then, in 2020, the provincial government put a "pause" on the project. When it came back to life, costs had increased dramatically, and the city came out with a modified plan the (the $6.8 billion stub train from downtown to Lynnwood). The province then threatened to pull their part of the funding, and commissioned a new downtown segment plan that advocated for elevated downtown, and nothing north of there.
Today? We are building the original truncated south phase to Shepard (by 2031!), but not the downtown part. The city is still debating what's going to happen downtown, dismissing elevated. They are hearing from office building and parking lot owners who are worried about its effect on property values, but I think they are also rejecting any ideas from the province on principle. About the only positive thing I can say is that the project is tangibly under construction now, with actual bridges over roadways done or nearly complete.
I blame the city (both planners and elected officials) and the province in that order, but mostly the city.
[1] One positive thing to come from that is the routing in Inglewood/Ramsay and 26 Ave SE that avoids taking down heritage buildings and destroying a vital community corridor.
unfortunately yes. Too much bullshits jobs (to suck up funds mostly and critize every aspects of non existant projects) and not enough people to take risks and do the job.